| Model | Width * Depth * Height | Layers | Load capacity | Specification |
|---|---|---|---|---|
| Light duty storage racks | 1200 * 400 * 2000 | 4 Layers | 100kg/Layers |
Frame: 30 * 50 * 0.6mm Beam: 30 * 50 * 0.4mm Steel panel: 0.3mm |
| 1200 * 500 * 2000 | ||||
| 1500 * 400 * 2000 | ||||
| 1500 * 500 * 2000 | ||||
| 2000 * 400 * 2000 | ||||
| 2000 * 500 * 2000 | ||||
| Medium duty storage racks | 1500 * 500 * 2000 | 4 Layers | 200kg/Layers |
Frame: 40 * 80 * 0.7mm Beam: 40 * 60 * 0.6mm Steel panel: 0.3mm |
| 1500 * 600 * 2000 | ||||
| 2000 * 500 * 2000 | ||||
| 2000 * 600 * 2000 | ||||
| Heavy Duty Pallet Racking System | 2000 * 600 * 2000 | 4 Layers | 300kg/Layers |
Frame: 40 * 80 * 0.7mm Beam: 40 * 60 * 0.7m Steel panel: 0.35mm |
| 2000 * 6000 * 2000 | 4 Layers | 400kg/Layers |
Frame: 40 * 80 * 1.0mm Beam: 40 * 60 * 1.0m Steel panel: 0.5mm |
|
| 2000 * 600 * 2000 | 4 Layers | 500kg/Layers |
Frame: 40 * 80 * 1.2mm Beam: 50 * 80 * 1.2m Steel panel: 0.6mm |
Qingdao port is the nearest port to our factory.
The material used is standard cold-rolled steel plate with an Electrostatic Powder Coating Surface to avoid rust. Our product range covers storage systems for various warehouses, logistics companies, and other facilities requiring optimized storage solutions.
Common colors available in our production are blue, white, orange, matte black, and matte gray.
Yes, customization is fully supported, but the order quantity for custom-sized shelves should be 20 sets or more.
Of course. We implement a total of 9 production stages to prevent rust. All shelves are powder coated, which is currently the most effective anti-rust process available.
Our delivery time is 10 days for full container loads (FCL), and 7 days for less than container loads (LCL).