1 / 5
| Model | Width * Depth * Height (mm) | Layers | Load Capacity | Specification Details |
|---|---|---|---|---|
| Light duty storage racks | 1200 * 400 * 2000 | 4 Layers | 100kg / Layer |
Frame: 30 * 50 * 0.6mm Beam: 30 * 50 * 0.4mm Steel panel: 0.3mm |
| 1200 * 500 * 2000 | ||||
| 1500 * 400 * 2000 | ||||
| 1500 * 500 * 2000 | ||||
| 2000 * 400 * 2000 | ||||
| 2000 * 500 * 2000 | ||||
| Medium duty storage racks | 1500 * 500 * 2000 | 4 Layers | 200kg / Layer |
Frame: 40 * 80 * 0.7mm Beam: 40 * 60 * 0.6mm Steel panel: 0.3mm |
| 1500 * 600 * 2000 | ||||
| 2000 * 500 * 2000 | ||||
| 2000 * 600 * 2000 | ||||
| Heavy Duty Pallet Racking System | 2000 * 600 * 2000 | 4 Layers | 300kg / Layer |
Frame: 40 * 80 * 0.7mm Beam: 40 * 60 * 0.7mm Steel panel: 0.35mm |
| 2000 * 6000 * 2000 | 4 Layers | 400kg / Layer |
Frame: 40 * 80 * 1.0mm Beam: 40 * 60 * 1.0mm Steel panel: 0.5mm |
|
| 2000 * 600 * 2000 | 4 Layers | 500kg / Layer |
Frame: 40 * 80 * 1.2mm Beam: 50 * 80 * 1.2mm Steel panel: 0.6mm |
Qingdao port
The material is standard cold-rolled steel plate. Electrostatic Powder Coating Surface, avoid rusty.
Products range: Various warehouses, logistics companies, and other places that need to store items.
Common colors in our factory are blue, white, orange, matte black, matte gray.
Yes, we can accept customization, but the order quantity of customized shelves should reach more than 20 sets.
Of course, we have a total of 9 production processes to prevent shelf rust. We are all powder coated. This is by far the best anti-rust process.
Our delivery time for the whole container is 10 days. LCL delivery time is 7 days.