1 / 5








| Model | Width*Depth*Height | Layers | Load capacity | Specification |
|---|---|---|---|---|
| Light duty storage racks | 1200*400*2000 | 4 Layers | 100kg/Layers |
Frame : 30*50*0.6mm Beam : 30*50*0.4mm Steel panel : 0.3mm |
| 1200*500*2000 | ||||
| 1500*400*2000 | ||||
| 1500*500*2000 | ||||
| 2000*400*2000 | ||||
| 2000*500*2000 | ||||
| Medium duty storage racks | 1500*500*2000 | 4 Layers | 200kg/Layers |
Frame : 40*80*0.7mm Beam : 40*60*0.6mm Steel panel : 0.3mm |
| 1500*600*2000 | ||||
| 2000*500*2000 | ||||
| 2000*600*2000 | ||||
| Heavy Duty Pallet Racking System | 2000*600*2000 | 4 Layers | 300kg/Layers |
Frame : 40*80*0.7mm Beam : 40*60*0.7m Steel panel : 0.35mm |
| 2000*6000*2000 | 4 Layers | 400kg/Layers |
Frame : 40 *80 * 1.0mm Beam : 40 * 60.* 1.0m Steel panel : 0.5mm |
|
| 2000*600*2000 | 4 Layers | 500kg/Layers |
Frame : 40 *80 * 1.2mm Beam : 50* 80.* 1.2m Steel panel : 0.6mm |








Qingdao port
Raw Material: The material is standard cold-rolled steel plate. Electrostatic Powder Coating Surface, avoid rusty.
Products Range: Various warehouses, logistics companies, and other places that need to store items
Common colors in our factory are blue, white, orange, matter black, matter gray
Yes, we can accept customization, but the order quantity of customized shelves should reach more than 20 sets
Of course, we have a total of 9 production processes to prevent shelf rust. We are all powder coated. This is by far the best anti-rust process
Our delivery time for the whole container is 10 days. LCL delivery time is 7 days